Spec board / Condition survey

Map Each Substrate and Failure Pattern

A useful survey describes where a condition exists and what is known about the surface beneath it. It does not turn a photo into a remote diagnosis.

Sections
7
Evidence links
1
Scope state
Open
Open RFP intake(778) 764-1440ext. 234
REQ-01Create the building and surface map

Divide the property by elevation, room, tenant zone or operating area. For each location, record substrate, approximate area, access method and known coating history. Begin the surface schedule with a date and its substrate and occupied zone; attach the available evidence before making the preparation, coating or phasing decision. The next checkpoint is “Keep walls, ceilings, trim, metalwork and specialty surfaces separate.” Attach dated photos to a consistent location code. Keep that action beside its observation. The coating-scope reviewer can then distinguish the intake surface schedule from painting closeout package material added during later pricing or investigation.

  • Attach dated photos to a consistent location code.
REQ-02Keep walls, ceilings, trim, metalwork and specialty surfaces separate

The comparison should address substrate-by-substrate condition codes, dated elevation photographs and failure patterns that remain observations rather than diagnoses; otherwise two prices may describe materially different work. A condition survey should distinguish chalking, peeling, corrosion and staining by substrate and elevation before any cause or treatment is assumed. Mark occupied, secure and public-facing zones; then attach dated photos to a consistent location code. Label each surface photograph, drawing and prior record by substrate and occupied zone and date. When an untested material or access constraint remains, record it in the surface schedule; identify the coating-scope reviewer review or painting closeout package document that could resolve it. A condition on one elevation cannot stand in for the history or preparation needs of every surface.

  • Mark occupied, secure and public-facing zones
  • Attach dated photos to a consistent location code
REQ-03Record failure without assuming the cause

Describe peeling, checking, blistering, staining, corrosion or impact damage in plain language. Water-entry, substrate and compatibility questions should remain open until reviewed. Describe each substrate, zone and coating condition separately, citing its supporting surface photograph, measurement or dated document. Keep hazardous-material disturbance outside the survey workflow. A finding at one substrate and occupied zone may alter the proposed preparation, coating or phasing decision; unobserved parts of the painting scope stay outside the available evidence.

  • Keep hazardous-material disturbance outside the survey workflow.
REQ-04Record whether the condition changes after rain or cleaning

“Record whether the condition changes after rain or cleaning” belongs on its own line in the surface schedule. For the substrate and occupied zone, pair the surface photograph evidence with any concealed or untested painting scope limits. List tests proposed and who interprets them. Keep hazardous-material disturbance outside the survey workflow. Cross-reference the preparation and coating response answer to its surface photograph; include the surface schedule drawing, a product document for the preparation and coating response, or a dated reply from the coating-scope reviewer. Resolve testing, containment and mockup approval before coating covers the substrate or the occupied-building sequence is fixed.

  • List tests proposed and who interprets them
  • Keep hazardous-material disturbance outside the survey workflow
REQ-05Turn observations into bid evidence

Create a surface schedule showing condition, proposed investigation, access constraint and acceptance record required for each area. Before proceeding, require a photo record before and after preparation. Give task ownership to the coating-scope reviewer; place its checkpoint before the preparation, coating or phasing decision, then name the expected painting closeout package. This separates current surface schedule evidence from the proposed preparation and coating response. Put manufacturer information and coating-scope reviewer input in the painting closeout package; file authority questions under the relevant painting scope decision.

  • Require a photo record before and after preparation.
REQ-06Flag mockup or sample areas

Resolve “Flag mockup or sample areas” before ranking proposals. State the baseline substrate and occupied zone, proposed preparation and coating response, exclusions, quantities and written change process. State protection and containment constraints. Require a photo record before and after preparation. Review each surface photograph while it can still change the preparation, coating or phasing decision. Record a dated preparation, coating or phasing decision choice or assign the remaining untested material or access constraint. Track that uncertainty in the painting closeout package, outside the lump-sum total.

  • State protection and containment constraints
  • Require a photo record before and after preparation
REQ-07Complete the condition survey record

Finish this condition survey as a surface schedule: include its starting evidence, location map, proposed preparation and coating response and unresolved limits. For “Map Each Substrate and Failure Pattern,” justify each preparation and coating response inclusion and assign the next untested material or access constraint. In the surface schedule, list the approvals, product records and painting closeout package expected. Continue with “Make Preparation Measurable”, “Separate Coating Work from Water-Entry Repairs”, and “Normalize Areas, Preparation and Coating Evidence” for related painting scope decisions. Use the surface schedule guide links for any wider preparation and coating response comparison. File each WorkSafeBC, strata or Surrey reference with the surface question it supports and its consultation date.

  • Name the next preparation, coating or phasing decision, responsible coating-scope reviewer and surface schedule evidence still required
  • Retain dated official painting scope sources and guide links within the painting closeout package