Spec board / Preparation standard

Make Preparation Measurable

Preparation language should be observable and tied to each substrate. Generic phrases make it difficult to compare proposals or confirm what happened before coating.

Sections
7
Evidence links
2
Scope state
Open
Open RFP intake(778) 764-1440ext. 234
REQ-01Define existing conditions and repair boundaries

Pair each substrate with the condition being addressed. Separate coating work from water-entry correction, structural repair, sealant design and other scopes. Begin the surface schedule with a date and its substrate and occupied zone; attach the available evidence before making the preparation, coating or phasing decision. The next checkpoint is “State cleaning and contamination assumptions.” Route suspect hazardous materials to the proper process before disturbance. Keep that action beside its observation. The coating-scope reviewer can then distinguish the intake surface schedule from painting closeout package material added during later pricing or investigation.

  • Route suspect hazardous materials to the proper process before disturbance.
REQ-02State cleaning and contamination assumptions

Review measurable cleaning, repair, preparation, coating and acceptance requirements for every substrate family in the context of the actual property rather than as a standard allowance. Preparation language such as clean or ready to paint is too broad unless the method, repair limit and acceptance check are written down. Identify repairs included and excluded; then route suspect hazardous materials to the proper process before disturbance. Label each surface photograph, drawing and prior record by substrate and occupied zone and date. When an untested material or access constraint remains, record it in the surface schedule; identify the coating-scope reviewer review or painting closeout package document that could resolve it. A condition on one elevation cannot stand in for the history or preparation needs of every surface.

  • Identify repairs included and excluded
  • Route suspect hazardous materials to the proper process before disturbance
REQ-03Request method and product evidence

Ask for proposed preparation methods, primers, coatings and current data sheets matched to the actual substrate and exposure. Describe each substrate, zone and coating condition separately, citing its supporting surface photograph, measurement or dated document. Require written approval for substitutions. A finding at one substrate and occupied zone may alter the proposed preparation, coating or phasing decision; unobserved parts of the painting scope stay outside the available evidence.

  • Require written approval for substitutions.
REQ-04Record surface-profile or adhesion criteria where reviewed as appropriate

“Record surface-profile or adhesion criteria where reviewed as appropriate” belongs on its own line in the surface schedule. For the substrate and occupied zone, pair the surface photograph evidence with any concealed or untested painting scope limits. Keep proposed coat counts tied to manufacturer documents and opacity requirements. Require written approval for substitutions. Cross-reference the preparation and coating response answer to its surface photograph; include the surface schedule drawing, a product document for the preparation and coating response, or a dated reply from the coating-scope reviewer. Resolve testing, containment and mockup approval before coating covers the substrate or the occupied-building sequence is fixed.

  • Keep proposed coat counts tied to manufacturer documents and opacity requirements
  • Require written approval for substitutions
REQ-05Set sample and acceptance checkpoints

Define mockup size, location, colour approval, texture expectations and who signs off. Add inspection points before prepared surfaces are concealed. Before proceeding, collect product, colour and closeout records. Give task ownership to the coating-scope reviewer; place its checkpoint before the preparation, coating or phasing decision, then name the expected painting closeout package. This separates current surface schedule evidence from the proposed preparation and coating response. Put manufacturer information and coating-scope reviewer input in the painting closeout package; file authority questions under the relevant painting scope decision.

  • Collect product, colour and closeout records.
REQ-06Record environmental limits from current product documents

Resolve “Record environmental limits from current product documents” before ranking proposals. State the baseline substrate and occupied zone, proposed preparation and coating response, exclusions, quantities and written change process. Use a deficiency and correction log. Collect product, colour and closeout records. Review each surface photograph while it can still change the preparation, coating or phasing decision. Record a dated preparation, coating or phasing decision choice or assign the remaining untested material or access constraint. Track that uncertainty in the painting closeout package, outside the lump-sum total.

  • Use a deficiency and correction log
  • Collect product, colour and closeout records
REQ-07Complete the preparation standard record

Finish this preparation standard as a surface schedule: include its starting evidence, location map, proposed preparation and coating response and unresolved limits. For “Make Preparation Measurable,” justify each preparation and coating response inclusion and assign the next untested material or access constraint. In the surface schedule, list the approvals, product records and painting closeout package expected. Continue with “Map Each Substrate and Failure Pattern”, “Normalize Areas, Preparation and Coating Evidence”, and “Separate Coating Work from Water-Entry Repairs” for related painting scope decisions. Use the surface schedule guide links for any wider preparation and coating response comparison. File each WorkSafeBC, strata or Surrey reference with the surface question it supports and its consultation date.

  • Name the next preparation, coating or phasing decision, responsible coating-scope reviewer and surface schedule evidence still required
  • Retain dated official painting scope sources and guide links within the painting closeout package